Mumbai Metro line 2A and seven to be operational by 2020


Commercial

MUMBAI (Metro Rail Information): Maharashtra Chief Minister (CM) Shri Devendra Fadnavis on Could 29, 2019, chaired a evaluate of all mega infrastructure initiatives within the state and prolonged the deadline to early 2020. The 18.6 KM lengthy Mumbai Metro line 2A hall will join Dahisar to D.N. Street with an elevated hall by way of Hyperlink Street and can have 18 stations.  

Then again, The 16.5 km Mumbai Metro line 7 hall will connecting Andheri East to Dahisar East by way of Western Specific Freeway and can have 16 stations.

S senior official from the chief minister’s workplace (CMO) mentioned “The 2 Metros, completely 35.1 km in size, might be operational by early 2020. The entire progress on Metro-2A and Metro-7 is 65% and 68% respectively”.

Mumbai Metro line 2A and seven are anticipated to cater to 16 lakh commuters within the metropolis. The Mumbai Metropolitan Area Improvement Authority (MMRDA) has proposed to introduce 10 new rakes for the monorail. Monorail Line 1 was inaugurated by former Maharashtra Chief Minister Prithviraj Chavan on February 1, 2014. 

The CM additionally directed officers to finish building of the extra six Metro traces in Mumbai and Mumbai Metropolitan Area (MMR) by 2022. “By 2022, we plan to have a Metro community of 119km by completion of Metro traces DN Nagar-Mankhurd (Metro-2B), Colaba-Bandra-Seepz (Metro -3), Wadala-Ghatkopar-Thane-Kasarvadavali (Metro-4), Wadala-GPO (Metro-4B), Thane-Bhiwandi-Kalyan (Metro-6) and Lokhandwala-Vikhroli (Metro-5),” the official mentioned, including that by 2022, work on 169km of extra Metro traces throughout the state will begin. Officers mentioned the work on MTHL might be accomplished by 2022-end.

Every day Updates from Metro & Railway



Supply hyperlink