Tender invited for electrification contract for Agra Metro Rail Undertaking



Agra, India (City Transport Information): The Uttar Pradesh Metro Rail Company Restricted (UPMRCL) invited bids from the skilled and eligible contractors for provide and set up of 750VDC Third Rail and 33kV electrification system for Agra Metro Rail mission.

Scope of Work

Design, Provide, Set up, Testing & Commissioning of Receiving cum Auxiliary Essential Sub Stations Together with Excessive Voltage Cabling from Grid Substations, 750 Volts DC third Rail Traction System, 33kV Cable Community, ASS, TSS & SCADA System for Hall-1 & 2 of Agra Metro Rail Undertaking at Agra, Uttar Pradesh, India.

Key info

  • Tender Discover No. AGE-1 & 2
  • Challenge Date: 18.10.2021
  • Estimated Value of Work: Rs 450 crores
  • Completion of labor: 3 years
  • Availability of Tender Paperwork: 18.10.2021 – 01.12.2021
  • Pre-bid Assembly: 22.11.2021 at 15.00 hrs.
  • Final Date to Submission of Bids: 01.12.2021 until 15.00 hrs.
  • Opening Date of Technical Bids: 02.12.2021 at 15.00 hrs.

This contract package deal shall be funded by the European Funding Financial institution (EIB).

Detailed Scope of Work

  • Design, supply, set up, testing, commissioning and technical / upkeep assist together with coaching of personnel for an entire, built-in Energy Provide system and DC Third Rail System, together with all Operations Management Centre and trackside tools essential to ship the necessities of this Specification.
  • High quality administration and high quality checking essential to fulfil the standard necessities contained in Quantity 3 and any high quality necessities specified within the current quantity.
  • The Energy Provide system and DC Third Rail Tools consists of Three 132/33 kV Receiving Substations (Gasoline Insulated Sub-stations) associated Auxiliary Essential Substations (3), and civil works (apart from PAC RSS) together with 132kV cables & equipment; DC Third Rail Traction System together with Earthing & Bonding equipments and stray present monitoring system; and 33 kV cable rings and the tools of all of the Auxiliary & 750V DC Traction Energy Provide tools for stations and Depots. Management and monitoring of the whole 132kV, 33 kV, 750VDC and 415 Volts energy provide system by means of SCADA system.

Undertaking particulars and deadlines to finish the work

The Agra Metro is consisting of two hall with whole route community of 29.65 km. Hall 1 will join Sikandara to Taj East Gate (14.25 km) with 14 stations and Hall 2 will join Agra Cantt. to Kalindi Vihar (15.4 km) with 15 stations.

  • PAC Depot (4.58 km): 12 months
  • Fatehabad Street to Taj East Gate (2.44 km): 12 months
  • Sikandra to Fatehabad Street (11.81 km): 36 months
  • Kalindi Vihar Depot (4.52 km): months
  • Agra Cantt to Kalindii Vihar (15.4 km): 36 months